First coat went on yesterday. Hopefully it'll be dry enough for a 2nd coat today. It needs doing, though, as the outside ground level is approx 1m higher than the inside floor level at the moment.
This will change once we have the external digging done, but there'll still be a ground level difference and its best to be safe.
The bitumen won't show as all that part is going to be walled in due to wall rocks that stick out and are too big to cut back - instead there'll be a shelf/cat walkway that is at the level of the floor in the living room and carries all the way along the kitchen (North) wall to the door into the extension...
And here's how the roof's progressing - Clive's hoping the weather will hold out long enough to get it finished over the next week or so.
Luckily(?) there's so much work to do inside that, if it does rain then we can always get on with walls/ceilings/floor etc etc etc....
And we've got 20 weeks left to finish it!!!! Eeeeeeek!